One engagement model runs all product lines. A small senior pod builds alongside your people, in two-week sprints, inside your security boundary.
Off-the-shelf tools stop at the edge of your environment, and only ever cover the slice they were built for.
Runs inside your cloud and your IAM. No metadata leaves for a third-party SaaS, and no page of a contract is uploaded anywhere.
Wired into your tagging, CMDB, data platform, canonical schemas, stewardship queues and existing approval process.
Forecasting fitted to your demand curves and provider mix; extraction tuned to the document families you actually receive.
Specialist capture tools each own one document family. The layer covers the rest of the grid — one pipeline, one schema, one set of stewards.
We transfer knowledge sprint by sprint, so your people operate, tune and extend it, set the thresholds and run the exception queue.
We carry the reusable ~70% — connectors, a model library, the five-stage pipeline, agent templates, a command-center blueprint — and build the ~30% that's uniquely yours.
A system that forecasts your spend, reads your contracts or writes to your master data is too close to the business to run anywhere else.
Forecasting, attribution, optimization and procurement on GoSpend; the five stages on the GoCore; typed tools, plans and gates on custom agents.
Each phase ends in a working, measurable outcome. You decide whether to proceed at every gate.
| Phase | Duration | What happens | Gate |
|---|---|---|---|
| 01 Discover | 2–3 weeks | Estate assessment, source inventory, data access, and the baseline — a savings target, a scored question, or the master fields a document family should populate. | baseline agreed |
| 02 Design | 2 weeks | Reference architecture for your stack, security review, schema mapping, confidence thresholds per field, and the build backlog. | architecture signed |
| 03 Build (pilot) | 4–6 weeks | Connectors and engines live on one estate: forecasting and attribution, or one document family running all five stages into a sandbox master. | the number is proven |
| 04 Productionize & scale | 6–10 weeks | Roll out across estates and document families, add optimization and procurement, tune confidence, stand up the steward workflow. | estate-wide |
| 05 Operate & improve | ongoing | Run-books, documentation, enablement — then continuous learning: corrections retrain extractors, realized spend recalibrates models. | handover |
Your engineers work in the same environment from sprint one, so the team that will operate the system is the team that watched it get built.
We're a build partner, not a data lake or a landlord.
Three steps, one quarter, measured against your live numbers.
One business unit, one question answered by hand, or one document family.
Two weeks: baseline, target, and a build plan for your environment.
Measured in your environment, not in a model.